Fall at Kamp Kaolin

Took these pics on Friday, October 24th, as it was a beautiful day.  

Insulation and drywall

Cellulose insulation was used for the ceiling and walls.  This was blown in from a special truck using bales of cellulose.  In the walls, they added water, but essentially the same raw materials.  Drywall went up in 2 days, so now the walls are really looking like a house.  

Site utilities work begins

See pictures below for culvert replacement as well as PECO gas line install.  Conduits were placed under concrete pipe for water line, sewer line, and gas line.