Check out the newly posted video on HJL website on window installation filmed at Kamp Kaolin.  Great job by our on-site project manager Jeff Shaw. http://hjlcms.com/

Link to Hugh J Lofting Construction Management Services web site/blog   http://hjlcms.com/2014/08/06/kamp-kaolin/       Link to article on our house from our builders open house last Friday:   http://www.chestercounty.com/2014/07/16/43708/a-home-for-the-next-century         Link to article in Philadelphia Magazine blog:   http://www.phillymag.com/property/2014/07/25/passive-house-building-principles-kamp-kaolin-landenberg/#gallery-1-39

Installed 3 – 100 foot “slinky” loops, hand crafted by our geothermal expert, John Malm.  John figured out the correct weight needed to float them out on the pond, and then filled the tubes with well water to sink them.  Will them connect these loops to the main geo pipes going to house that will […]

Exposed aggregate; was washed off Sat morning after the pour on Friday.  Looks fantastic!

Estelle and I were out on the boat this past Friday and took some shots from my camera phone. Cool perspective….